03 / SYSTEMTWO CONNECTED LEVELS25°12'N / 55°16'E

EVERYTHING
CONNECTS.

Design information, procurement, specialist production and site execution operate through one coordinated system.

LEVEL / 01

PROJECT DELIVERY
SYSTEM.

01 / 06

Define the architectural intent, performance brief and conditions of success.

01

Standard details

A defined operating standard reduces uncertainty and makes performance visible.

02

Work packages

A defined operating standard reduces uncertainty and makes performance visible.

03

Procurement

A defined operating standard reduces uncertainty and makes performance visible.

04

Specialist crews

A defined operating standard reduces uncertainty and makes performance visible.

05

QA/QC

A defined operating standard reduces uncertainty and makes performance visible.

06

Digital controls

A defined operating standard reduces uncertainty and makes performance visible.

07

Handover

A defined operating standard reduces uncertainty and makes performance visible.

LEVEL / 02

GROUP
INTEGRATION.

The companies remain specialized. The system connecting them is shared.

01CONSTRUCTIONOPERATING
02DEVELOPMENTSOPERATING
03JOINERYOPERATING
04ALUMINIUMOPERATING
05SYSTEMSOPERATING
06MATERIALSOPERATING

FROM FIRST IDEA
TO BUILT ASSET.

  1. 01Concept
  2. 02Pre-construction
  3. 03Structure
  4. 04Envelope
  5. 05MEP
  6. 06Finishes
  7. 07Commissioning
  8. 08Handover

VBC / PACKAGE LIBRARY

ONE SYSTEM.
EVERY DETAIL.

VBC-SPEC / WP / 003

Waterproofing

System
Approved assembly
QA gate
48-hour flood test
Documentation
Inspection record + photographic evidence

HAVE A VISION?

LET'S MAKE
IT CONCRETE.

[ START A PROJECT → ]